Analysis of moral hazard in Engineering agent construction system
Source: By:利华 王
DOI: https://doi.org/10.30564/frae.v3i1.1634
Abstract:Analyze the moral hazard issues in the construction agency system, and enumerate the performance of moral hazard. Deeply analyze the causes, start with strengthening supervision and perfecting incentive measures, eliminate the impact of moral hazard, and give play to the advantages of agent construction.
References:[1]Zhang Jiangfeng. Analysis of the main points of the management of the government agency project[J]. Sichuan Cement,2019(06):162. [2]Zhang Laisheng.Research on the Problems in the Management of “Agent Construction” of Municipal Engineering[J].Jiangxi Building Materials,2019(11):244-245. [3]Kuang Yuan.Research on the application of agent construction management mode in school infrastructure projects[J].Architecture Design Management,2017,34(05):47-48+54. [4]Liu Guangpeng.Comparative Study of EPC General Contract and Agent Construction System[J].Engineering Construction and Design,2019(12):243-244. [5]Dai Dashuang, Zhang Hao.Research on Moral Hazard of Agent Construction Units from the Perspective of Revenue[J].Project Management Technology,2016,14(7):21-23. [6]Yi Fei.Problems and Countermeasures of China’s Agent Construction Model[J].Anhui Architecture,2019,26(10):231-232. [7]Deng Jiaojiao.Research on the Incentive Mechanism of Agent Units for Government Investment Projects[D].Tianjin: Tianjin University,2007. [8]Jiang Chengliang, Zhao Zheng, Weng Yan.Exploration of Agent Construction Projects[J].Shanxi Architecture,2018,44(31):236-237.