Development of a Fuzzy Fire Risk Evaluation Model for Building Construction Sites in Hong Kong
Source: By:John F.Y. Yeung, Daniel W.M. Chan
DOI: https://doi.org/10.30564/jcr.v3i2.4106
Abstract:[1] Hong Kong Labour Department, 2008. Occupational Safety and Health Statistics Bulletin Issue No. 7 2007. Hong Kong Special Administrative Region: Government Printer. [2] Anonymous, Oct 26 2005. Fire in One Silver Sea, Ming Pao Daily News. [3] Anonymous, Dec 2 2006. Fire in Mega Box, Sing Tao Daily News. [4] Chan, A.P.C., Chan, D.W.M., Chiang, Y.H., Tang, B.S., Chan, E.H.W., Ho, K.S.K., 2004. Exploring critical success factors for partnering in construction projects, Journal of Construction Engineering and Management, ASCE. 130(2), 188-198. [5] Yam, M.C.H., Yeung, J.F.Y., Chan, R.K.W., Wong, F.K.W., Chan, A.P.C., Chan, D.W.M., July 2009. Identification of fire risk criteria and attributes for building construction sites in Hong Kong. Proceedings of the AUBEA Conference 2009 on “Managing Change: Challenges in Education and Construction for the 21st Century.” University of South Australia, Adelaide, Australia. 7-10. [6] Yeung, J.F.Y., Chan, D.W.M., 2019. Developing a holistic fire risk assessment framework for building construction sites in Hong Kong, Journal of Construction Research. 1(1), 43-58. [7] Lo, S.M., Lu, J.A., Hu, Y.Q., Fang, Z., 2001. Incorporating reliability and variance into weighting function of fire risk assessment for high-rise buildings, China Safety Science Journal. 11(5), 11-13. (in Chinese) [8] Lo, S.M., Hu, B.Q., Liu, M., Yuen, K.K., 2005. On the use of reliability interval method and grey relational model for fire safety ranking of existing buildings, Fire Technology. 41(4), 255-270. [9] Lo, S.M., 1999. A fire safety assessment system for existing buildings, Fire Technology. 35(2), 131-152. [10] Saaty, T.L., 2008. Decision making with the analytic hierarchy process, International Journal of Services Sciences. 1(1), 83-98. [11] Yiu, C.Y., Ho, H.K., Lo, S.M., Hu, B.Q., 2005. Performance evaluation for cost estimators by reliability interval method, Journal of Construction Engineering and Management, ASCE. 131(1), 108-116. [12] Moore, R.E., 1979. Methods and applications of interval analysis. Philadelphia: SIAM. [13] Xu, Y.L., Chan, A.P.C., Yeung, J.F.Y., 2010. Developing a fuzzy risk allocation model for PPP projects in China, Journal of Construction Engineering and Management, ASCE. 136(8), 894-903. [14] Shen, L.Y., Wu, W.C., Ng, S.K., 2001. Risk assessment for construction joint ventures in China, Journal of Construction Engineering and Management, ASCE. 127(1), 76-81. [15] El-Sayegh, S.M., 2008. Risk assessment and allocation in the UAE construction industry, International Journal of Project Management. 26(4), 431-438. [16] Lu, R.S., Lo, S.L., Hu, J.Y., 1999. Analysis of reservoir water quality using fuzzy synthetic evaluation, Stochastic Environmental Research and Risk Assessment. 13(5), 327-336. [17] Sadiq, R., Rodriguez, M.J., 2004. Fuzzy synthetic evaluation of disinfection by-products: A risk-based indexing system, Journal of Environmental Management. 73(1), 1-13. [18] Hsu, T.H., Yang, T.S., 1997. The application of fuzzy synthetic decision to the human resource management, Fu Jen Management Review. 4(2), 85-100. [19] Zhao, H.F., Qiu, W.H., Wang, X.Z., 1997. Fuzzy Integrative Evaluation Method of the Risk Factor, Systems Engineering - Theory & Practice. 7(1), 95-123. [20] Yeung, J.F.Y., Chan, A.P.C., Chan, D.W.M., 2007. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study. 25(12), 1219-1237. [21] Chow, L.K., 2005. Incorporating fuzzy membership functions and gap analysis concept into performance evaluation of engineering consultants – Hong Kong study, Unpublished PhD thesis,Department of Civil Engineering, The University of Hong Kong, HKSAR. [22] Tah, J.H., Carr, V., 2000. A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics. 18(4), 491-500.