Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City
Source: By:Shiferaw Garoma Wayessa, Ayana Abera Beyene
DOI: https://doi.org/10.30564/jbms.v3i1.3149
Abstract: Road constructing in Ethiopia is increasingly in demand to meet its medium and long term development programs. Most internal roads of Oromia city/town are cobblestone and gravel. Some portions along the alignment proposed and existing roads traversed low resistance of the subgrade that affect the stability of the upper layers of cobblestones. Structural failure is observed on cobblestone roads, and it would be constructed with good quality or low quality of materials. Nekemte Cobblestones Projects have been started in 2014 widely which were filled in most areas today as we observed that needs to be addressed and a corresponding remedial measures must be drawn. A possible counteractive actions had been ordered for every observed destroyed to achieve the standard road situation of the study zone. An evaluation was made use observation, interviews, laboratory test and field test to govern an appropriateness of cobblestones. The lie beneath soil used for bottom layers of road structure based on standard of Ethiopian Road Authority (ERA) low volume road standards. Therefore, result from the field test and laboratory test shown, causes of cobblestone road failures of Nekemte street segment were mostly because of the construction steps/sequence, quality of materials, road construction time, absence of appropriate design, quality supervisor, absences of drainage structures, lack of highly compaction, lack of accurately fill fine aggregate and suddenly high loads vehicle applied on cobblestone road. References:[1]. Era Manual of Design Manual for Low Volume Roads and Road Maintenance Booklet - Part G Final Draft, August 2011 [2].Professor Abebe Dinku.2010, Addis Ababa University’s Institute of Technology. Cobblestone construction grows in Ethiopia despite concerns over quarry safety and the assessment study was supposed to have been conducted before the implementation of the cobblestone project and at its completion [3].Staccioli, Romolo Augusto. 2003. The Roads of the Romans. Los Angeles: J. Paul Getty Museum. [4].Northwestern University. Siege and Commune Collection. Photo # 300: “Paris Boulevard with Barricade and Cannon.” Accessed April 25, 2006: [5].Manual, Pavement for Labour-based Road Construction, Timor-Leste, ILO & Don Bosco 2015, ISBN: 978-92-2-130857-7 [6].Komar, P.D., and Allan, J.C., 2010, “Design with Nature”strategies for shore protection—The construction of a cobble berm and artifiial dune in an Oregon State Park [7].Theodros, G. G. (2014). A Rapid Desk Study: Afghanistan - Current Status and Future Prospects for the Construction Sector. United Kingdom: Crown Copyright. [8].Nuhamin Getachew, Performance of Construction Consultants in Addis Ababa: A Study of Current Practices [9].ERA MANUAL 2016, PART D: CONSTRUCTION OF LOW VOLUME ROADS [10].City Realty Website. Cobblestone Lofts Webpage. Accessed April 25, 2006: http://www.cityrealty.com/condos/building_iframe.php?lid=7197. [11].Desert wide Website. Cobblestone Subdivision Webpage. Accessed April 25, 2006: http://www.desertwide.com/subdivisions/Phoenix_Cobblestone.shtml.